Something nice is on it’s way from Italy

I had an email from my local De Rosa dealer today to tell me that my Neo Primato frame is due at his store on 8th December. The factory apologized for the longer than normal delivery time. It was delayed as I ordered the frame at the height of the trade show season. Still 10 weeks to build and deliver a frame with a custom steerer is quite good and it will be a nice early Christmas present. I’ll document the build taking lots of pictures and boring whoever reads this stuff with lots of description. But to keep you going here’s a link to a nice summary of how to build a bike.
http://tinyurl.com/RR28-bikeassembly


Leave a Reply